§ 91.910. Basic fees.
The fees for the permit required by section 52.140 shall be as established in section 91.70 based on the following categories:
TABLE A
EROSION AND SEDIMENT CONTROL PLAN REVIEW
AND INSPECTION FEES (UTILITIES)
Per lineal foot disturbed—Minimum fee as established by 91.40
TABLE B
EROSION AND SEDIMENT CONTROL PLAN REVIEW
AND INSPECTION FEES
(MULTI-FAMILY, COMMERCIAL, AND INDUSTRIAL)
500 square feet or less
501 square feet or more
**Area is based on ground area disturbed
TABLE C
676 square feet or less detached garage ..... No fee
ALL OTHER CONSTRUCTION
EROSION AND SEDIMENT CONTROL
PLAN REVIEW AND INSPECTION FEES
(SINGLE-FAMILY RESIDENTIAL)
500 square feet or less
501 to 3,000 square feet
3,001 square feet or more
For each additional 1,000 square feet
**Area is based on building footprint
TABLE D
EROSION AND SEDIMENT CONTROL PLAN REVIEW
AND INSPECTION FEES (DEMOLITION ONLY)
Single-family residential
All others
(If building permit is issued at same time as demolition permit, the fee will be waived.)
TABLE E
EROSION AND SEDIMENT CONTROL PLAN REVIEW
AND INSPECTION FEES (MAINTENANCE PROJECTS)
Annual permit
Other Inspections and fees:
1.
Inspection outside of normal business hours per hour*
(minimum charge—two (2) hours)
*Or the total hourly cost to the city, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. (2006-Or-053, § 3, 5-12-06; 2013-Or-120, § 29, 12-6-13)