§ 91.480. Permit fees for heating, air conditioning and refrigeration by alternative sources of energy.  


Latest version.
  • Permits shall be required for the construction, installation, alteration, addition or repair of any furnace, boiler, heating or power plant or system, or any device or equipment connected therewith, or for the construction, installation, alteration or repair of any cooling piping and equipment, or of any air conditioning system or ventilation system or sheet metal ductwork or equipment connected therewith, or of any refrigeration plant or equipment when using an alternate source of energy such as, but not limited to, solar energy. The fee shall be determined by the building official. (78-Or-257, § 20, 12-22-78; 2013-Or-120, § 21, 12-6-13)

Editor's note

Section 20 of 78-Or-257, adopted Dec. 22, 1978, repealed former § 91.480 pertaining to steam or hot water systems other than "G" permit systems and enacted in lieu thereof a new § 91.480 to read as herein set out. Former § 91.480 was derived from Code 1960, as amended, § 207.030 and Ord. of 9-27-74, § 3.