§ 115.30. Permit required.  


Latest version.
  • Every licensed building mover shall, in each and every instance, before raising, holding up or moving any building from and/or to a location within the city limits, obtain a permit therefor from the building official. Said permit shall contain an approval of the new site to which the building is to be moved. Said moving permit shall state specifically the route to be taken and all movement requirements designated by the director of public works and shall limit the time for the removal of said building. No building permit for the foundation, construction, alteration, or repair of such building shall be issued until such moving permit has been filed. Additionally, no building permit will be issued until a site plan is provided indicating building orientation and the locations of all building entrances in compliance with applicable zoning requirements. In no case shall a building be moved that is not worth sixty (60) percent of the cost of a similar new building. (Code 1960, As Amend., § 37.080; Ord. of 3-30-73, § 3; 86-Or-269, § 1, 11-21-86; 2005-Or-054, § 1, 7-1-05; 2013-Or-130, § 2, 12-6-13; Ord. No. 2017-061 , § 4, 11-3-17)

Cross reference

Permit to move buildings on, along or across parkways, § PB7-7.