§ 52.240. Changes to plans.  


Latest version.
  • All changes or modifications to the approved erosion and sediment control plans must adhere to the following conditions:

    (1)

    All proposals to modify the approved plans must be submitted to the city engineer for his/her approval. No grading or any type of work in connection with any proposed modification shall be without prior written approval of the issuing authority.

    (2)

    When inspection of a site indicates that the approved erosion and sediment control plan needs change, the change shall be in compliance with the erosion and sediment control criteria contained in the Manual of Standards. The erosion control inspector may approve minor modifications to approved erosion and sediment control plans in the field if documented on a field inspection report. The modification shall be noted on the approved plans, signed by the inspector, and dated. A list of allowable field modifications for use by field inspection personnel will be kept in the Manual of Standards.

    (3)

    The permittee shall submit requests for major revisions to approved erosion and sediment control plans, such as the addition or deletion of a sediment basin, to the city engineer. This includes revisions due to plan and site discrepancies and inadequacies at controlling erosion and sediment as revealed through inspection. (96-Or-042, § 1, 5-10-96)